İhsan Yanıkoğlu
İhsan Yanıkoğlu
Assistant Professor of Industrial Engineering, Özyeğin University
Verified email at ozyegin.edu.tr - Homepage
Title
Cited by
Cited by
Year
A Practical Guide to Robust Optimization
BL Gorissen, İ Yanıkoğlu, D den Hertog
Omega 53, 124-137, 2015
4292015
A Survey of Adjustable Robust Optimization
İ Yanıkoğlu, BL Gorissen, D den Hertog
European Journal of Operational Research 277 (3), 799-813, 2019
1302019
Safe Approximations of Ambiguous Chance Constraints Using Historical Data
İ Yanıkoğlu, D den Hertog
INFORMS Journal on Computing 25 (4), 666-681, 2013
492013
Robust Dual-Response Optimization
İ Yanıkoğlu, D den Hertog, JPC Kleijnen
IIE Transactions (Best Paper Award: Oper. Engineer. & Analytics) 48 (3), 298-312, 2016
262016
A Robust Optimization Approach for Humanitarian Needs Assessment Planning under Travel Time Uncertainty
B Balcik, İ Yanıkoğlu
European Journal of Operational Research 282 (1), 40-57, 2020
252020
Decision Rule Bounds for Two-Stage Stochastic Bilevel Programs
I Yanikoğlu, D Kuhn
SIAM Journal on Optimization 28 (1), 198-222, 2018
16*2018
The Value of Quality Grading in Remanufacturing under Quality Level Uncertainty
İ Yanıkoğlu, M Denizel
International Journal of Production Research 59 (3), 839-859, 2021
132021
Adjustable Robust Parameter Design with Unknown Distributions
I Yanikoglu, D Den Hertog, JPC Kleijnen
CentER Discussion Paper Series No. 2013-022, 2012
102012
Load Dependent Lead Time Modelling: A Robust Optimization Approach
E Albey, İ Yanıkoğlu, R Uzsoy
Winter Simulation Conference Paper, 2017
62017
Robust Reformulations of Ambiguous Chance Constraints with Discrete Probability Distributions
İ Yanıkoğlu
IJOCTA 9 (2), 216-232, 2019
22019
Selected Topics in Robust Optimization
I Yanikoglu
Optimization Techniques for Problem Solving in Uncertainty, 140-166, 2018
22018
Robust Optimization Methods for Chance Constrained, Simulation-Based, and Bilevel Problems
İ Yanıkoğlu
Ph.D. Thesis, 2014
22014
A Robust Optimization Approach for Production Planning under Exogenous Planned Lead Times
E Albey, İ Yanıkoğlu, R Uzsoy
Winter Simulation Conference Paper, 2019
12019
An Improved Modeling Method for Designing a Backlight Module for a Flat-Screen Television
E Albey, O Kurt, İ Yanıkoğlu
EP Patent EP3502773A1, 2019
2019
A Tutorial on Deriving Adjustable Robust Counterparts
İ Yanıkoğlu
2017
Stochastic Lot Sizing Problems under Monopoly
I Yanıkoglu
M.Sc. Thesis, 2009
2009
Geri Dönüşümlü Malzeme Yönetimi Carlsberg AŞ
P Ekibi, A Danışman
ENDÜSTRİ PROJELERİ, 12, 2007
2007
The system can't perform the operation now. Try again later.
Articles 1–17