Location-based management for construction: Planning, scheduling and control
R Kenley, O Seppänen
Routledge, 2006
3972006
The combination of last planner system and location-based management system
O Seppänen, G Ballard, S Pesonen
Lean construction journal 6 (1), 43-54, 2010
2482010
Comparison between location based management and takt time planning
AG Frandson, O Seppänen, ID Tommelein
23rd annual conference of the international group for lean construction, 3-12, 2015
1182015
Empirical research on the success of production control in building construction projects
O Seppänen
Teknillinen korkeakoulu, 2009
1152009
Location-based management of construction projects: Part of a new typology for project scheduling methodologies
R Kenley, O Seppänen
Proceedings of the 2009 Winter Simulation Conference (WSC), 2563-2570, 2009
1102009
Direct digital construction: Technology-based operations management practice for continuous improvement of construction industry performance
M Tetik, A Peltokorpi, O Seppänen, J Holmström
Automation in construction 107, 102910, 2019
932019
Construction flow index: a metric of production flow quality in construction
R Sacks, O Seppänen, V Priven, J Savosnick
Construction management and economics 35 (1-2), 45-63, 2017
902017
Real-time resource tracking for analyzing value-adding time in construction
J Zhao, O Seppänen, A Peltokorpi, B Badihi, H Olivieri
Automation in Construction 104, 52-65, 2019
882019
Categorizing modularization strategies to achieve various objectives of building investments
A Peltokorpi, H Olivieri, AD Granja, O Seppänen
Construction management and economics 36 (1), 32-48, 2018
822018
Effects of the location-based management system on production rates and productivity
O Seppänen, J Evinger, C Mouflard
Construction management and economics 32 (6), 608-624, 2014
782014
Survey comparing critical path method, last planner system, and location-based techniques
H Olivieri, O Seppänen, TCL Alves, NM Scala, V Schiavone, M Liu, ...
Journal of construction engineering and management 145 (12), 04019077, 2019
632019
Improving workflow and resource usage in construction schedules through location-based management system (LBMS)
H Olivieri, O Seppänen, A Denis Granja
Construction management and economics 36 (2), 109-124, 2018
622018
Takt time planning in cruise ship cabin refurbishment: Lessons for lean construction
A Heinonen, O Seppänen
Proc. 24th Ann. Conf. of the Int’l. Group for Lean Construction, IGLC …, 2016
58*2016
A comparison of takt time and LBMS planning methods
O Seppänen
Annual Conference of the International Group for Lean Construction, 2014
572014
A shared ontology suite for digital construction workflow
Y Zheng, S Törmä, O Seppänen
Automation in Construction 132, 103930, 2021
562021
A case study of line-of-balance based schedule planning and control system
O Seppänen, E Aalto
Proceedings of the 13th Annual Conference of the International Group for …, 2005
552005
Implementation of line-of-balance based scheduling and project control system in a large construction company
M Soini, I Leskelä, O Seppänen
Proceedings of the 12th Annual Conference of the International Group for …, 2004
542004
How takt production contributes to construction production flow: a theoretical model
J Lehtovaara, O Seppänen, A Peltokorpi, P Kujansuu, M Grönvall
Construction management and economics 39 (1), 73-95, 2021
522021
Applying level of detail in a BIM-based project: An overall process for lean design management
P Uusitalo, O Seppänen, E Lappalainen, A Peltokorpi, H Olivieri
Buildings 9 (5), 109, 2019
472019
Integration of last planner system and location-based management system
O Seppänen, R Modrich, G Ballard
Proc. 23rd Annual Conference of the International Group for Lean …, 2015
472015