Borja García de Soto
Borja García de Soto
Assistant Professor, NYU Abu Dhabi
Verified email at nyu.edu - Homepage
Title
Cited by
Cited by
Year
Productivity of digital fabrication in construction: Cost and time analysis of a robotically built wall
B García de Soto, I Agustí-Juan, J Hunhevicz, S Joss, K Graser, G Habert, ...
Automation in Construction 92, 297-311, 2018
812018
Implementation of Scrum in the Construction Industry
T Streule, N Miserini, O Bartlomé, M Klippel, B García de Soto
Procedia Engineering 164, 269-276, 2016
602016
Construction automation: Research areas, industry concerns and suggestions for advancement
Q Chen, B García de Soto, BT Adey
Automation in Construction 94, 22-38, 2018
392018
Analysis of adverse weather for excusable delays
LD Nguyen, J Kneppers, B García de Soto, W Ibbs
Journal of construction engineering and management 136 (12), 1258-1267, 2010
302010
BIM-based Last Planner System tool for improving construction project management
D Heigermoser, B García de Soto, ELS Abbott, DKH Chua
Automation in Construction 104, 246-254, 2019
242019
A Bayesian network model to predict accidents on Swiss highways
M Deublein, M Schubert, BT Adey, B García de Soto
Infrastructure Asset Management 2 (4), 145-158, 2015
242015
Using a Tabu-search Algorithm and 4D Models to Improve Construction Project Schedules
B García de Soto, A Rosarius, J Rieger, Q Chen, BT Adey
Procedia Engineering 196, 698-705, 2017
192017
Implications of Construction 4.0 to the workforce and organizational structures
B García de Soto, I Agustí-Juan, S Joss, J Hunhevicz
International Journal of Construction Management, 1-13, 2019
182019
Investigation of the case-based reasoning retrieval process to estimate resources in construction projects
B García de Soto, BT Adey
Procedia Engineering 123, 169-181, 2015
152015
A process for the development and evaluation of preliminary construction material quantity estimation models using backward elimination regression and neural networks
B García de Soto, BT Adey, D Fernando
Journal of Cost Analysis and Parametrics 7 (3), 180-218, 2014
152014
A hybrid methodology to estimate construction material quantities at an early project phase
B García de Soto, BT Adey, D Fernando
International Journal of Construction Management 17 (3), 165-196, 2017
122017
Knowledge areas delivered in project management programs: exploratory study
LD Nguyen, YY Chih, B García de Soto
Journal of Management in Engineering 33 (1), 04016025, 2017
122017
BIM-based Applications of Metaheuristic Algorithms to Support the Decision-making Process: Uses in the Planning of Construction Site Layout
R Amiri, JM Sardroud, B García de Soto
Procedia Engineering 196, 558-564, 2017
92017
Preliminary Resource-based Estimates Combining Artificial Intelligence Approaches and Traditional Techniques
B García de Soto, BT Adey
Procedia Engineering 164, 261-268, 2016
92016
Cyber security challenges and vulnerability assessment in the construction industry
BRK Mantha, B García de Soto
Creative Construction Conference 2019, CCC 2019, 29 June - 2 July 2019 …, 2019
82019
Evaluating the operation and routine maintenance of municipal roads in Switzerland
BT Adey, B García de Soto, C Senn
Infrastructure Asset Management 4 (3), 96-108, 2017
82017
Predicting Road Traffic Accidents using Artificial Neural Network Models
B García de Soto, A Bumbacher, M Deublein, BT Adey
Infrastructure Asset Management, 1-49, 2018
62018
Robust IFC Files to Improve Information Exchange: An Application for Thermal Energy Simulation
Q Chen, YE Harmanci, Y Ou, B García de Soto
Resilient Structures and Sustainable Construction, AAE-4, 2017
62017
Rethinking the roles in the AEC industry to accommodate digital fabrication
B García de Soto, I Agustí-Juan, S Joss, J Hunhevicz, G Habert, BT Adey
Creative Construction Conference 2018, CCC 2018, 30 June - 3 July 2018 …, 2018
52018
The potential of digital fabrication to improve productivity in construction: cost and time analysis of a robotically fabricated concrete wall
BG De Soto, I Agustí-juan, J Hunhevicz, G Habert, B Adey
Autom Constr 92, 297-311, 2018
52018
The system can't perform the operation now. Try again later.
Articles 1–20