Follow
Yihai Bao
Yihai Bao
NIST, Johns Hopkins University
Verified email at jh.edu - Homepage
Title
Cited by
Cited by
Year
Macromodel-based simulation of progressive collapse: RC frame structures
Y Bao, SK Kunnath, S El-Tawil, HS Lew
Journal of Structural Engineering 134 (7), 1079-1091, 2008
3022008
Testing and analysis of steel and concrete beam-column assemblies under a column removal scenario
F Sadek, J Main, HS Lew, Y Bao
2822011
Collapse Test of Three-Story Half-Scale Reinforced Concrete Frame Building
Y Xiao, S Kunnath, FW Li, YB Zhao, HS Lew, Y Bao
ACI Structural Journal 112 (4), 429-438, 2015
1312015
An experimental and computational study of reinforced concrete assemblies under a column removal scenario
HS Lew, Y Bao, F Sadek, JA Main, S Pujol, MA Sozen
NIST Technical Note 1720, 2011
1262011
Modeling of Reinforced Concrete Assemblies under Column-Removal Scenario
Y Bao, HS Lew, SK Kunnath
Journal of Structural Engineering 140 (1), 2014
1192014
Experimental study of reinforced concrete assemblies under column removal scenario
HS Lew, Y Bao, S Pujol, MA Sozen
ACI Structural Journal 111 (4), 881, 2014
1112014
Simplified progressive collapse simulation of RC frame–wall structures
Y Bao, SK Kunnath
Engineering Structures 32 (10), 3153-3162, 2010
872010
Advances in computational simulation of gravity-induced disproportionate collapse of RC frame buildings
SK Kunnath, Y Bao, S El-Tawil
Journal of Structural Engineering 144 (2), 03117003, 2018
562018
A special reinforcing technique to improve resistance of beam-to-tubular column connections for progressive collapse prevention
X Qin, W Wang, Y Chen, Y Bao
Engineering Structures 117, 26-39, 2016
552016
Simplified nonlinear simulation of shield tunnel lining reinforced by epoxy bonded steel plates
H Zhao, X Liu, Y Bao, Y Yuan, Y Bai
Tunnelling and Underground Space Technology 51, 362-371, 2016
552016
Evaluation of structural robustness against column loss: Methodology and application to RC frame buildings
Y Bao, JA Main, SY Noh
Journal of Structural Engineering 143 (8), 04017066, 2017
492017
Experimental study of through diaphragm connection types under a column removal scenario
X Qin, W Wang, Y Chen, Y Bao
Journal of Constructional Steel Research 112, 293–304, 2015
452015
Slab effect of composite subassemblies under a column removal scenario
W Wang, J Wang, X Sun, Y Bao
Journal of Constructional Steel Research 129, 141-155, 2017
442017
Full-scale experimental investigation on stagger effect of segmental tunnel linings
X Liu, Y Zhang, Y Bao
Tunnelling and Underground Space Technology 102, 103423, 2020
342020
Full-scale test of a steel moment-resisting frame with composite floor under a penultimate edge column removal scenario
J Wang, W Wang, Y Bao, D Lehman
Journal of Constructional Steel Research 162, 105717, 2019
292019
Performance of precast concrete moment frames subjected to column removal: Part 1, experimental study
HS Lew, JA Main, Y Bao, F Sadek, VP Chiarito, SD Robert, JO Torres
PCI J 62 (5), 35-52, 2017
262017
Robustness of Precast Concrete Frames: Experimental and Computational Studies
JA Main, Y Bao, HS Lew, F Sadek
262014
Full-Scale Test of a Steel–Concrete Composite Floor System with Moment-Resisting Connections under a Middle-Edge Column Removal Scenario
J Wang, W Wang, Y Bao
Journal of Structural Engineering 146 (5), 04020067, 2020
192020
Numerical modeling and parametric study of hybrid fiber-rebar reinforced concrete tunnel linings
X Liu, Q Sun, W Song, Y Bao
Engineering Structures 251, 113565, 2021
162021
Nonlinear simulation of tunnel linings with a simplified numerical modelling
H Zhao, X Liu, Y Bao, Y Yuan
Structural Engineering & Mechanics 61 (5), 593-603, 2017
162017
The system can't perform the operation now. Try again later.
Articles 1–20