Critical path determination by incorporating minimum and maximum time and distance constraints into linear scheduling A Kallantzis, S Lambropoulos Engineering, Construction and Architectural Management 11 (3), 211-222, 2004 | 55 | 2004 |
Linear versus network scheduling: A critical path comparison A Kallantzis, J Soldatos, S Lambropoulos Journal of Construction Engineering and Management 133 (7), 483-491, 2007 | 45 | 2007 |
Correspondence of activity relationships and critical path between time-location diagrams and CPM A Kallantzis, S Lambropoulos Operational Research 4, 277-290, 2004 | 14 | 2004 |
Discussion of “Comparison of linear scheduling model and repetitive scheduling method” by Kris G. Mattila and Amy Park A Kallantzis, S Lambropoulos Journal of Construction Engineering and Management 130 (3), 463-467, 2004 | 8 | 2004 |
Evaluation of differing subsurface ground conditions in construction contracts AC Kallantzis, JD Borcherding, JT O’Connor Journal of Professional Issues in Engineering Education and Practice 133 (1 …, 2007 | 3 | 2007 |
The application of OLAP technology in monitoring construction cost A Maravas, A Kallantzis, S Lambropoulos Proceedings of the Third International Conference on Construction in the …, 2005 | 2 | 2005 |
Evaluation of critical path methods for linear projects A Kallantzis, S Lambropoulos Ahmed, S., Ahmad, I., SL and Azhar,. S.(eds) Proceedings of the 2 nd …, 2003 | 1 | 2003 |
COMPARISON OF LINEAR SCHEDULING MODEL AND REPETITIVE SCHEDULING METHOD. DISCUSSION PG Ioannou, IT Yang Journal of Construction Engineering and Management 130 (3), 2004 | | 2004 |