Evaluation of alternative contracting techniques on FDOT construction projects RD Ellis Jr, JH Pyeon, ZJ Herbsman, E Minchin, K Molenaar | 96 | 2007 |
Schedule effectiveness of alternative contracting strategies for transportation infrastructure improvement projects K Choi, YH Kwak, JH Pyeon, K Son Journal of construction engineering and management 138 (3), 323-330, 2012 | 44 | 2012 |
Construction cost estimation using a case-based reasoning hybrid genetic algorithm based on local search method S Jung, JH Pyeon, HS Lee, M Park, I Yoon, J Rho Sustainability 12 (19), 7920, 2020 | 20 | 2020 |
Effectiveness study of methods for removing temporary pavement markings in roadway construction zones Y Cho, K Kabassi, JH Pyeon, K Choi, C Wang, T Norton Journal of construction engineering and management 139 (3), 257-266, 2013 | 19 | 2013 |
Blockchain-based network concept model for reliable and accessible fine dust management system at construction sites S Cho, M Khan, J Pyeon, C Park Applied Sciences 11 (18), 8686, 2021 | 18 | 2021 |
A study of simulation-based contract incentives and disincentives usage RD Ellis, JH Pyeon Construction Research Congress 2005: Broadening Perspectives, 1-10, 2005 | 16 | 2005 |
Development of improved 4D CAD system for horizontal works in civil engineering projects L Kang, J Pyeon, H Moon, C Kim, M Kang Journal of computing in civil engineering 27 (3), 212-230, 2013 | 15 | 2013 |
Development of a simulation model to predict the impact of incentive contracts on transportation construction project time performance JH Pyeon University of Florida, 2005 | 10 | 2005 |
Improving Transportation Construction Project Performance: Development of a Model to Support the Decision-Making Process for Incentive/Disincentive Construction Projects, MTI … JH Pyeon, T Park | 9 | 2010 |
Analyzing the potential of hybrid and electric off-road equipment in reducing carbon emissions from construction industries M Holian, JH Pyeon | 8 | 2017 |
Systematic Procedures to Determine Incentive/Disincentive Dollar Amounts for Highway Transportation Construction Projects, Research Report 11-22 JH Pyeon, EB Lee | 7 | 2012 |
Evaluation of seal coating treatments to manage temporary pavement paint markings during highway construction RD Ellis, JH Pyeon, SH Lee, B Kim KSCE Journal of Civil Engineering 14, 461-471, 2010 | 7 | 2010 |
Cost estimate modeling of transportation management plans for highway projects JH Pyeon, EB Lee, RD Ellis, T Park Mineta Transportation Institute, 2012 | 6 | 2012 |
Coarsening model of cavity nucleation and thin film delamination from single-crystal with proton implantation JW Hong, JH Pyeon, JW Tedesco, YB Park Physical Review B 75 (21), 214102, 2007 | 6 | 2007 |
A framework for post-disaster facility restoration management: needs and requirements for the use of hybrid simulation M Park, SH Lee, HS Lee, M Choi, S Hwang, MG Moon, S Lee, JH Pyeon Construction Research Congress 2014: Construction in a Global Network, 1269-1278, 2014 | 5 | 2014 |
A method of assigning weight values for qualitative attributes in CBR cost model HS Lee, SY Kim, MS Park, SH Ji, KH Seong, JH Pyeon Korean Journal of Construction Engineering and Management 12 (1), 53-61, 2011 | 5 | 2011 |
Traffic Impact on Incentive Contracting Project Time Performance during Highway Construction JH Pyeon Journal of Civil Engineering and Architecture 4 (7), 9-14, 2010 | 3 | 2010 |
Trend Analysis of Long Tunnels Worldwide JH Pyeon | 2 | 2016 |
Proposed methodology for dynamic schedule compression J Lee, RD Ellis, JH Pyeon 2007 IEEE International Conference on Automation Science and Engineering …, 2007 | 2 | 2007 |
Hazardous Area Identification Model Using Automated Data Collection (ADC) based on BIM HS Kim, HS Lee, MS Park, KP Lee, JH Pyeon Korean Journal of Construction Engineering and Management 11 (6), 14-23, 2010 | 1 | 2010 |