Folgen
Bryan Tyrone Adey
Bryan Tyrone Adey
Bestätigte E-Mail-Adresse bei ibi.baug.ethz.ch
Titel
Zitiert von
Zitiert von
Jahr
Productivity of digital fabrication in construction: Cost and time analysis of a robotically built wall
BG De Soto, I Agustí-Juan, J Hunhevicz, S Joss, K Graser, G Habert, ...
Automation in construction 92, 297-311, 2018
4152018
Construction automation: Research areas, industry concerns and suggestions for advancement
Q Chen, BG de Soto, BT Adey
Automation in construction 94, 22-38, 2018
2302018
Modeling of corrosion-induced concrete cover cracking: A critical analysis
A Jamali, U Angst, B Adey, B Elsener
Construction and Building Materials 42, 225-237, 2013
1682013
Prediction of road accidents: A Bayesian hierarchical approach
M Deublein, M Schubert, BT Adey, J Köhler, MH Faber
Accident Analysis & Prevention 51, 274-291, 2013
1412013
Condition evolution in bridge management systems and corrosion-induced deterioration
G Roelfstra, R Hajdin, B Adey, E Brühwiler
Journal of Bridge Engineering 9 (3), 268-277, 2004
1182004
Concrete cover cracking owing to reinforcement corrosion–theoretical considerations and practical experience
U Angst, B Elsener, A Jamali, B Adey
Materials and corrosion 63 (12), 1069-1077, 2012
1092012
Using look-ahead plans to improve material flow processes on construction projects when using BIM and RFID technologies
Q Chen, BT Adey, C Haas, DM Hall
Construction innovation 20 (3), 471-508, 2020
822020
Identifying enablers for coordination across construction supply chain processes: a systematic literature review
Q Chen, DM Hall, BT Adey, CT Haas
Engineering, construction and architectural management 28 (4), 1083-1113, 2020
772020
Cyclic loading of end plate moment connections
BT Adey, GY Grondin, JJR Cheng
Canadian Journal of Civil Engineering 27 (4), 683-701, 2000
772000
Determination of near‐optimal restoration programs for transportation networks following natural hazard events using simulated annealing
J Hackl, BT Adey, N Lethanh
Computer‐Aided Civil and Infrastructure Engineering 33 (8), 618-637, 2018
742018
Risk-based approach to the determination of optimal interventions for bridges affected by multiple hazards
B Adey, R Hajdin, E Brühwiler
Engineering structures 25 (7), 903-912, 2003
702003
Estimating network related risks: A methodology and an application in the transport sector
J Hackl, JC Lam, M Heitzler, BT Adey, L Hurni
Natural Hazards and Earth System Sciences 18 (8), 2273-2293, 2018
642018
Overview of existing bridge management systems-report by the IABMAS Bridge Management Committee
Z Mirzaei, BT Adey, L Klatter, JS Kong
6th International Conference on Bridge Maintenance, Safety and Management …, 2012
612012
Use of exponential hidden Markov models for modelling pavement deterioration
N Lethanh, BT Adey
International Journal of Pavement Engineering 14 (7), 645-654, 2013
582013
Methodology and base cost models to determine the total benefits of preservation interventions on road sections in Switzerland
BT Adey, T Herrmann, K Tsafatinos, J Lüking, N Schindele, R Hajdin
Structure and Infrastructure Engineering 8 (7), 639-654, 2012
522012
Use of unmanned aerial vehicle photogrammetry to obtain topographical information to improve bridge risk assessment
J Hackl, BT Adey, M Woźniak, O Schümperlin
Journal of infrastructure systems 24 (1), 04017041, 2018
502018
Quantitative investigation on the accuracy and precision of Scan-to-BIM under different modelling scenarios
ME Esfahani, C Rausch, MM Sharif, Q Chen, C Haas, BT Adey
Automation in Construction 126, 103686, 2021
492021
Supply and demand system approach to development of bridge management strategies
B Adey, R Hajdin, E Brühwiler
Journal of infrastructure systems 9 (3), 117-131, 2003
452003
Using a Tabu-search algorithm and 4D models to improve construction project schedules
BG de Soto, A Rosarius, J Rieger, Q Chen, BT Adey
Procedia Engineering 196, 698-705, 2017
442017
A Bayesian network model to predict accidents on Swiss highways
M Deublein, M Schubert, BT Adey, B García de Soto
Infrastructure Asset Management 2 (4), 145-158, 2015
422015
Das System kann den Vorgang jetzt nicht ausführen. Versuchen Sie es später erneut.
Artikel 1–20