Folgen
Daniel M. Hall
Daniel M. Hall
Assistant Professor, TU Delft
Bestätigte E-Mail-Adresse bei tudelft.nl - Startseite
Titel
Zitiert von
Zitiert von
Jahr
Do you need a blockchain in construction? Use case categories and decision framework for DLT design options
JJ Hunhevicz, DM Hall
Advanced Engineering Informatics 45, 101094, 2020
2502020
Digital building twins and blockchain for performance-based (smart) contracts
JJ Hunhevicz, M Motie, DM Hall
Automation in Construction 133, 103981, 2022
1482022
Resource efficiency in industrialized housing construction–A systematic review of current performance and future opportunities
F Kedir, DM Hall
Journal of Cleaner Production, 125443, 2021
1232021
Mirror-breaking strategies to enable digital manufacturing in Silicon Valley construction firms: a comparative case study
DM Hall, JK Whyte, J Lessing
Construction management and economics 38 (4), 322-339, 2020
1232020
Identifying the role of supply chain integration practices in the adoption of systemic innovations
DM Hall, A Algiers, RE Levitt
Journal of management in engineering 34 (6), 04018030, 2018
1192018
Identifying enablers for coordination across construction supply chain processes: a systematic literature review
Q Chen, DM Hall, BT Adey, CT Haas
Engineering, construction and architectural management 28 (4), 1083-1113, 2020
972020
Using look-ahead plans to improve material flow processes on construction projects when using BIM and RFID technologies
Q Chen, BT Adey, C Haas, DM Hall
Construction innovation 20 (3), 471-508, 2020
972020
Early Stages in the Institutionalization of Integrated Project Delivery
DM Hall, WR Scott
Project Management Journal, 2019
882019
The impact of digital transformation on formal and informal organizational structures of large architecture and engineering firms
MM Bonanomi, DM Hall, S Staub-French, A Tucker, CML Talamo
Engineering, Construction and Architectural Management 27 (4), 872-892, 2019
742019
Cross-phase product configurator for modular buildings using kit-of-parts
J Cao, DF Bucher, DM Hall, J Lessing
Automation in Construction 123, 103437, 2021
672021
The transition to the circular economy of the construction industry: Insights into sustainable approaches to improve the understanding
R Charef, W Lu, D Hall
Journal of Cleaner Production 364, 132421, 2022
572022
The role of integrated project delivery elements in adoption of integral innovations
DM Hall, A Algiers, T Lehtinen, RE Levitt, C Li, P Padachuri
EPOC 2014, 2014
492014
Governing collaborative project delivery as a common-pool resource scenario
DM Hall, MM Bonanomi
Project management journal 52 (3), 250-263, 2021
392021
Digital fabrication, BIM and early contractor involvement in design in construction projects: A comparative case study
MS Ng, K Graser, DM Hall
Architectural Engineering and Design Management 19 (1), 39-55, 2023
382023
Exploiting digitalization for the coordination of required changes to improve engineer-to-order materials flow management
Q Chen, BT Adey, CT Haas, DM Hall
Construction Innovation 22 (1), 76-100, 2022
382022
Incentivizing high-quality data sets in construction using blockchain: a feasibility study in the swiss industry
JJ Hunhevicz, T Schraner, DM Hall
ISARC. Proceedings of the International Symposium on Automation and Robotics …, 2020
342020
DFAB House: A comprehensive demonstrator of digital fabrication in architecture
MK Konrad Graser, Marco Baur, Aleksandra Anna Apolinarska, Kathrin Dörfler ...
Fabricate, 130-139, 2020
34*2020
A proposed material passport ontology to enable circularity for industrialized construction
F Kedir, DF Bucher, DM Hall
EC3 Conference 2021 2, 91-98, 2021
322021
Assessing IFC classes with means of geometric deep learning on different graph encodings
F Collins, A Braun, M Ringsquandl, D Hall, A Borrmann
Proc. of the 2021 European Conference on Computing in Construction, 2021
322021
One approach does not fit all (smart) cities: Causal recipes for cities' use of “data and analytics”
RWS Ruhlandt, R Levitt, R Jain, D Hall
Cities 104, 102800, 2020
312020
Das System kann den Vorgang jetzt nicht ausführen. Versuchen Sie es später erneut.
Artikel 1–20