Alain HAIT
Title
Cited by
Cited by
Year
The energy scheduling problem: Industrial case-study and constraint propagation techniques
C Artigues, P Lopez, A Haït
International Journal of Production Economics 143 (1), 13-23, 2013
952013
Integrated production and utility system approach for optimizing industrial unit operations
MH Agha, R Thery, G Hetreux, A Hait, JM Le Lann
Energy 35 (2), 611-627, 2010
852010
Integrated production and utility system approach for optimizing industrial unit operations
MH Agha, R Thery, G Hetreux, A Hait, JM Le Lann
Energy 35 (2), 611-627, 2010
852010
Project scheduling under uncertainty using fuzzy modelling and solving techniques
M Masmoudi, A Haït
Engineering Applications of Artificial Intelligence 26 (1), 135-149, 2013
782013
On electrical load tracking scheduling for a steel plant
A Haït, C Artigues
Computers & Chemical Engineering 35 (12), 3044-3047, 2011
572011
Gestion de production et ressources humaines: méthodes de planification dans les systèmes productifs
P Baptiste
Presses inter Polytechnique, 2005
502005
Motion planning on rough terrain for an articulated vehicle in presence of uncertainties
A Hait, T Simeon
Proceedings of IEEE/RSJ International Conference on Intelligent Robots and …, 1996
481996
Robust motion planning for rough terrain navigation
A Hait, T Siméon, M Taïx
IN IEEE INT. CONF. ON INTELLIGENT ROBOTS AND SYSTEMS KYONGJU, KOREA, 1999
381999
A hybrid CP/MILP method for scheduling with energy costs
A Hait, C Artigues
European Journal of Industrial Engineering 5 (4), 471-489, 2011
362011
Scheduling under energy constraints
C Artigues, P Lopez, A Haït
International Conference on Industrial Engineering and Systems Management …, 2009
242009
Algorithms for rough terrain trajectory planning
A Haït, T Simeon, M Taïx
Advanced Robotics 16 (8), 673-699, 2002
212002
A rough-cut capacity planning model with overlapping
G Baydoun, A Haït, R Pellerin, B Clément, G Bouvignies
OR spectrum 38 (2), 335-364, 2016
152016
The extended resource task network: a framework for the combined scheduling of batch processes and CHP plants
R Thery, G Hetreux, MH Agha, A Haït, JM Le Lann
International journal of production research 50 (3), 623-646, 2012
142012
The extended resource task network: a framework for the combined scheduling of batch processes and CHP plants
R Thery, G Hetreux, MH Agha, A Haït, JM Le Lann
International journal of production research 50 (3), 623-646, 2012
142012
Fuzzy uncertainty modelling for project planning: application to helicopter maintenance
M Masmoudi, A Haït
International journal of production research 50 (13), 3594-3611, 2012
122012
A new event-based MILP model for the resource-constrained project scheduling problem with variable intensity activities
A Haït, G Baydoun
The IEEE international conference on industrial engineering and engineering …, 2012
102012
A GA-based fuzzy resource leveling optimization for helicopter maintenance activity
M Masmoudi, A Haït
Proceedings of the 7th Conference of the European Society for Fuzzy Logic …, 2011
102011
A GA-based fuzzy resource leveling optimization for helicopter maintenance activity
M Masmoudi, A Haït
Proceedings of the 7th Conference of the European Society for Fuzzy Logic …, 2011
102011
Ordonnancement sous contraintes d'énergie et de ressources humaines
A Hait, C Artigues, P Baptiste, M Trépanier
102007
Fuzzy tactical project planning: Application to helicopter maintenance
M Masmoudi, EW Hans, A Haït
ETFA2011, 1-8, 2011
92011
The system can't perform the operation now. Try again later.
Articles 1–20