Pierre Baptiste
Pierre Baptiste
Verified email at polymtl.ca
Title
Cited by
Cited by
Year
Generalized Petri net reduction method
H Lee-Kwang, J Favrel, P Baptiste
IEEE transactions on systems, man, and cybernetics 17 (2), 297-303, 1987
1641987
Scheduling cross docking operations under full, partial and no information on inbound arrivals
R Larbi, G Alpan, P Baptiste, B Penz
Computers & Operations Research 38 (6), 889-900, 2011
1252011
Scheduling issues for environmentally responsible manufacturing: The case of hoist scheduling in an electroplating line
C Subai, P Baptiste, E Niel
International Journal of Production Economics 99 (1-2), 74-87, 2006
772006
Resolution of the cyclic multi-hoists scheduling problem with overlapping partitions
C Varnier, A Bachelu, P Baptiste
INFOR: Information Systems and Operational Research 35 (4), 309-324, 1997
681997
Hoist scheduling problem: an approach based on constraint logic programming
P Baptiste, B Legeard, C Varnier
Proceedings 1992 IEEE international conference on robotics and automation …, 1992
561992
A branch and bound algorithm for the F/no− idle/Cmax
P Baptiste, LK Hguny
Proceedings of the international conference on industrial engineering and …, 1997
551997
Sustainability assessment using fuzzy-inference technique (SAFT): A methodology toward green products
M Sabaghi, C Mascle, P Baptiste, R Rostamzadeh
Expert Systems with Applications 56, 69-79, 2016
542016
Gestion de production et ressources humaines: méthodes de planification dans les systèmes productifs
P Baptiste
Presses inter Polytechnique, 2005
522005
A survey of models and algorithms for emergency response logistics in electric distribution systems. Part I: Reliability planning with fault considerations
N Perrier, B Agard, P Baptiste, JM Frayret, A Langevin, R Pellerin, ...
Computers & Operations Research 40 (7), 1895-1906, 2013
512013
Cross-docking: increasing platform efficiency by sequencing incoming and outgoing semi-trailers
MY Maknoon, P Baptiste
International Journal of Logistics: Research and Applications 12 (4), 249-261, 2009
502009
Evaluation of products at design phase for an efficient disassembly at end-of-life
M Sabaghi, C Mascle, P Baptiste
Journal of Cleaner Production 116, 177-186, 2016
492016
Constraint-based model for the cyclic multi-hoists scheduling problem
M Manier, C Varnier, P Baptiste
Production Planning & Control 11 (3), 244-257, 2000
472000
A survey of models and algorithms for emergency response logistics in electric distribution systems. Part II: Contingency planning level
N Perrier, B Agard, P Baptiste, JM Frayret, A Langevin, R Pellerin, ...
Computers & Operations Research 40 (7), 1907-1922, 2013
462013
Process-mining-based workflow model fragmentation for distributed execution
SX Sun, Q Zeng, H Wang
IEEE Transactions on Systems, Man, and Cybernetics-Part A: Systems and …, 2010
442010
A contract net based intelligent agent system for solving the reactive hoist scheduling problem
D Jégou, DW Kim, P Baptiste, KH Lee
Expert systems with applications 30 (2), 156-167, 2006
382006
Integration of inventory and transportation decisions in decentralised supply chains
MA Viau, M Trepanier, P Baptiste
International Journal of Logistics Systems and Management 5 (3-4), 249-272, 2009
362009
Etat de l'art: ordonnancement de robots de manutention en galvanoplastie
MA Manier, P Baptiste
Automatique-productique informatique industrielle 28 (1), 7-35, 1994
351994
Shedding some light on photovoltaic solar energy in Africa–A literature review
C Brunet, O Savadogo, P Baptiste, MA Bouchard
Renewable and Sustainable Energy Reviews 96, 325-342, 2018
322018
An assessment of the integration of nurse timetable changes with operating room planning and scheduling
C Di Martinelly, P Baptiste, MY Maknoon
International Journal of Production Research 52 (24), 7239-7250, 2014
322014
Behavior descriptions of structure-complex Petri nets based on synchronous composition
Z Qingtian
Journal of Software 15 (3), 327-337, 2004
302004
The system can't perform the operation now. Try again later.
Articles 1–20