Follow
Tchernev Nikolay
Tchernev Nikolay
LIMOS UMR 6158
Verified email at isima.fr
Title
Cited by
Cited by
Year
Job-shop based framework for simultaneous scheduling of machines and automated guided vehicles
P Lacomme, M Larabi, N Tchernev
International Journal of Production Economics 143 (1), 24-34, 2013
1662013
A combined financial and physical flows evaluation for logistic process and tactical production planning: Application in a company supply chain
M Comelli, P Féniès, N Tchernev
International journal of production economics 112 (1), 77-95, 2008
1642008
A simple metaheuristic approach to the simultaneous scheduling of machines and automated guided vehicles
L Deroussi, M Gourgand, N Tchernev
International Journal of Production Research 46 (8), 2143-2164, 2008
1372008
An MILP for scheduling problems in an FMS with one vehicle
A Caumond, P Lacomme, A Moukrim, N Tchernev
European Journal of Operational Research 199 (3), 706-722, 2009
1172009
A memetic algorithm for the job-shop with time-lags
A Caumond, P Lacomme, N Tchernev
Computers & Operations Research 35 (7), 2331-2356, 2008
972008
Urban traffic systems modelling methodology
M Chabrol, D Sarramia, N Tchernev
International journal of Production economics 99 (1-2), 156-176, 2006
622006
Object-oriented methodology for FMS modelling and simulation
P Kellert, N Tchernev, C Force
International Journal of Computer Integrated Manufacturing 10 (6), 405-434, 1997
551997
Simultaneous job input sequencing and vehicle dispatching in a single-vehicle automated guided vehicle system: a heuristic branch-and-bound approach coupled with a discrete …
P Lacomme, A Moukrim, N Tchernev*
International Journal of Production Research 43 (9), 1911-1942, 2005
512005
Impact of empty vehicle flow on optimal flow path design for unidirectional AGV systems
XC Sun, N Tchernev
International Journal of Production Research 34 (10), 2827-2852, 1996
471996
A disjunctive graph for the job-shop with several robots
P Lacomme, M Larabi, N Tchernev
MISTA conference 20, 285-292, 2007
382007
Job-shop like manufacturing system with variable power threshold and operations with power requirements
S Kemmoe, D Lamy, N Tchernev
International Journal of Production Research 55 (20), 6011-6032, 2017
312017
Model for flexibility evaluation in manufacturing network strategic planning
S Kemmoe, PA Pernot, N Tchernev
International Journal of Production Research 52 (15), 4396-4411, 2014
292014
Une contribution à la mesure de la performance dans la supply chain hospitalière: L’exemple du processus opératoire
P Féniès, M Gourgand, N Tchernev
2ème conférence francophone en Gestion et Ingénierie de Systèmes …, 2004
292004
Modélisation du processus logistique dans les systèmes flexibles de production
N Tchernev
Clermont-Ferrand 2, 1997
291997
A reduced vns based approach for the dynamic continuous berth allocation problem in bulk terminals with tidal constraints
N Cheimanoff, F Fontane, MN Kitri, N Tchernev
Expert Systems with Applications 168, 114215, 2021
282021
Generic simulation model for hybrid flow-shop
N Grangeon, A Tanguy, N Tchernev
Computers & industrial engineering 37 (1-2), 207-210, 1999
271999
An effective multi-start multi-level evolutionary local search for the flexible job-shop problem
S Kemmoé-Tchomté, D Lamy, N Tchernev
Engineering Applications of Artificial Intelligence 62, 80-95, 2017
242017
A job-shop with an energy threshold issue considering operations with consumption peaks
S Kemmoé, D Lamy, N Tchernev
IFAC-PapersOnLine 48 (3), 788-793, 2015
242015
A GRASP× ELS approach for the job-shop with a web service paradigm packaging
M Chassaing, J Fontanel, P Lacomme, L Ren, N Tchernev, P Villechenon
Expert Systems with Applications 41 (2), 544-562, 2014
212014
A decisional modelling for supply chain management in franchised networks: application in franchise bakery networks
P Fenies, S Lagrange, N Tchernev
Production Planning & Control 21 (6), 595-608, 2010
212010
The system can't perform the operation now. Try again later.
Articles 1–20